Rostock Group Co., Ltd. found in 2011, one professional enterprise delivers solution and service of Field Measurement, Process Automation Control, On-line Analyzers, Fire & Gas Detectors, Heat Tracing, Control Valves, On-Off  Valves, Pressure Safety Valves, Compressors and Pumps and etc, mainly serve for industry projects in oil &gas, refinery, petrochemical, chemical, mineral, power plant and etc. Head quarter locates in UAE, main market is in Middle east and Africa.


Over the years, worked as one process measurement & control system integrator, involved in engineering, procurement, integration, installation, maintenance & after service. The strategic partnership with world famous brands Yokogawa, ABB, Emerson, Siemens, Schneider, Honeywell, Tokyo Keiso, Endress Hauser, Oldham, Spectrux, Bartec, Flowserve, Koso, Samson, Farris, Zook, Ebara, Milton Roy, Grundfos and etc were the driving forces for our successful development. Moreover, we also supply wide range of revamping and replacement spare parts service.

 

Our main service portfolio as below:

l  PLC, DCS, ESD, SCADA System Integration

l  Pressure, Temperature, Level, Flow Measurement

l  Gas and liquid on-line analytical

l  Gas & flame detectors

l  Heat tracing tape

l  Control valve, on-off valve, Safety valve, Rupture disc

l  Compressor turbine & pumps

 

Experience, combined with importance of routine professional training, experimental and quality of work have classed the company as one of the best in this field from Dubai of UAE. We always endeavor to give best and rigorous solution and service to achieved cost-efficient goal.


What can we do?

Evaluation Phase: Basic engineering, process calculation & sizing, order code selection, submit of basic technical & commercial offer along with Exceptional & Deviation list

源文件


TBE Phase : Technical bid clarification, technial & commercial review meeting, meeting of minutes signing conclusion, submit of detailed technical engineering documents and final techncial & commerical offer

源文件

kick-off phase: Contract Kick-off meeting, meeting of minutes conclusion, advance payment bank guarantee, advance payment transfer, procurement,project change control and scheduel control

源文件

Integration phase: Integration of control system panels, mashalling panels, IRP panels, programming and all related works before FAT

1

FAT& TPA Phase: Factory acceptance test, functional tests, third party inspection acceptance, packing and delivery

12

Installation & SAT: Site installation superviosry, site acceptance test, training and Perforamance/quality guarantee

1